SAFed - Safety Assessment Federation SAFed - Safety Assessment Federation
  • Home
  • About
    • About Us
    • Our History
    • The Team
    • Who We Work With
  • Owners & Users
    • Why use a SAFed Member
    • Owner / User Guidance
  • Publications
    • TC1 Pressure Equipment
    • TC2 Machinery Lift & Crane
    • TC3 Electrotechnical
    • TC4 Welding & Materials
    • TC5 Non-Destructive Testing
    • TC6 ENGINEERING TESTING, INSPECTION, CERTIFICATION
    • TC7 Power Presses
    • TC8 Local Exhaust Ventilation
    • TC9 Health & Safety
    • TC10 Emerging Technologies
    • TC11 Training
    • Standards
    • Representation on Other Committees
  • News
  • Find a member

JOIN CONTACT

TC6 Conformity Assessment

TC6 Engineering Testing, Inspection, Certification & Compliance (ETICC)

 

TC 6 meets as required to discuss any matter affecting conformity assessment. In addition, it produces from time-to-time specific SAFed Guidelines and Guidance to meet arising situations.

General

CAC 01 Issue 02 - In-service Inspection procedures – Acceptance of documentation from third parties
CAC 01 Issue 02 - In-service Inspection procedures – Acceptance of documentation from third parties
CAC 02 Issue 02 - In-service Inspection Procedures -Acceptance of documentation from third parties – Information to clients providing such documentation
CAC 02 Issue 02 - In-service Inspection Procedures -Acceptance of documentation from third parties – Information to clients providing such documentation
CAC 03 Issue 01 In-service Inspection procedures – Acceptance of documentation from third parties – Requirement for the calibration of measuring equipment which may have a significant influence on the results of an examination (ISO/IEC 17020 Clause 6.2.6)
CAC 03 Issue 01 In-service Inspection procedures – Acceptance of documentation from third parties – Requirement for the calibration of measuring equipment which may have a significant influence on the results of an examination (ISO/IEC 17020 Clause 6.2.6)
ETICC02 Issue 1.0 In-service Inspection procedures – Preparation of Plant for the Purpose of Inspection
ETICC02 Issue 1.0 In-service Inspection procedures – Preparation of Plant for the Purpose of Inspection

Unit 4, First Floor, 70 South Lambeth Road, Vauxhall, London, SW8 1RL

Telephone +44 (0)20 7582 3208 Email admin@safed.co.uk

  • Home
  • About
  • Owners & Users
  • Publications
  • News
  • Find a member

JOIN CONTACT

  • Home
  • About
    • About Us
    • Our History
    • The Team
    • Who We Work With
  • Owners & Users
    • Why use a SAFed Member
    • Owner / User Guidance
  • Publications
    • TC1 Pressure Equipment
    • TC2 Machinery Lift & Crane
    • TC3 Electrotechnical
    • TC4 Welding & Materials
    • TC5 Non-Destructive Testing
    • TC6 ENGINEERING TESTING, INSPECTION, CERTIFICATION
    • TC7 Power Presses
    • TC8 Local Exhaust Ventilation
    • TC9 Health & Safety
    • TC10 Emerging Technologies
    • TC11 Training
    • Standards
    • Representation on Other Committees
  • News
  • Find a member
  • +44 (0)20 7582 3208
  • admin@safed.co.uk