<?xml version="1.0" encoding="utf-8" ?><rss version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom"
     xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
     xmlns:media="http://search.yahoo.com/mrss/">

   <channel>
       <title>TC 1 Pressure Equipment - SAFed - The Safety Assessment Federation</title>
       <description><![CDATA[<p><strong><em>Please note that there will be references in these guidance documents and content with respect to previously existing provisions under EU Regulation. As of 1<sup>st</sup> January 2021 relevant UK rather than EU legislation will apply, and the same for UK designated standards rather than standards cited in the Official Journal of the European Union. More information is available at</em></strong></p>
<p><strong><em><a href="https://www.gov.uk/guidance/using-the-ukca-mark-from-1-january-2021#technical-documentation" target="_blank" rel="noopener noreferrer">https://www.gov.uk/guidance/using-the-ukca-mark-from-1-january-2021#technical-documentation</a>  </em></strong></p>
<p><strong><em> </em></strong><strong><em>During early 2021 the SAFed Guidance documents and content will be reviewed, updated and revised on the website. Please continually check back for updates. If there are any questions or queries, please contact <a href="mailto:admin@safed.co.uk">admin@safed.co.uk</a></em></strong></p>
<p>Current Projects – TC 1 meets on a regular basis to discuss any matter affecting the inspection of Pressure Equipment. In addition, it produces from time-to-time specific SAFed Guidelines and Guidance to meet arising situations.</p>]]></description>
       <link>https://www.safed.co.uk/publications-home/tc-1?format=html</link>
              <lastBuildDate>Mon, 08 Dec 2025 10:32:36 +0000</lastBuildDate>
       <atom:link href="https://www.safed.co.uk/publications-home/tc-1?format=rss" rel="self" type="application/rss+xml"/>
       <language>en-GB</language>
       <sy:updatePeriod>hourly</sy:updatePeriod>
       <sy:updateFrequency>1</sy:updateFrequency>

              <item>
           <title>PEDG04 - Iss 1.0 DEC 2025 A Guide to the Interpretation of the Pressure Equipment (Safety) Regulations 2026 (EEMUA Publication 251)</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/138-pedg04-iss-1-0-dec-2025-a-guide-to-the-interpretation-of-the-pressure-equipment-safety-regulations-2026?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/138-pedg04-iss-1-0-dec-2025-a-guide-to-the-interpretation-of-the-pressure-equipment-safety-regulations-2026/file" length="1092345" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/138-pedg04-iss-1-0-dec-2025-a-guide-to-the-interpretation-of-the-pressure-equipment-safety-regulations-2026/file"
                fileSize="1092345"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEDG04 - Iss 1.0 DEC 2025 A Guide to the Interpretation of the Pressure Equipment (Safety) Regulations 2026 (EEMUA Publication 251)</media:title>
           <media:description type="html"><![CDATA[]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/138-pedg04-iss-1-0-dec-2025-a-guide-to-the-interpretation-of-the-pressure-equipment-safety-regulations-2026/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/138-pedg04-iss-1-0-dec-2025-a-guide-to-the-interpretation-of-the-pressure-equipment-safety-regulations-2026?format=html</guid>
           <description><![CDATA[]]></description>
           <author>Rachel.Culpan@safed.co.uk (Rachel Culpan)</author>
           <category>Current joint guidance by SAFed and PECF</category>
           <pubDate>Mon, 08 Dec 2025 10:32:36 +0000</pubDate>
       </item>
              <item>
           <title>PEC26 Issue 1.0 - Considerations for establishing the date of examination of safety valves which have been in storage</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/135-pec26-issue-1-0-considerations-for-establishing-the-date-of-examination-of-safety-valves-which-have-been-in-storage?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/135-pec26-issue-1-0-considerations-for-establishing-the-date-of-examination-of-safety-valves-which-have-been-in-storage/file" length="401018" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/135-pec26-issue-1-0-considerations-for-establishing-the-date-of-examination-of-safety-valves-which-have-been-in-storage/file"
                fileSize="401018"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC26 Issue 1.0 - Considerations for establishing the date of examination of safety valves which have been in storage</media:title>
           <media:description type="html"><![CDATA[]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/135-pec26-issue-1-0-considerations-for-establishing-the-date-of-examination-of-safety-valves-which-have-been-in-storage/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/135-pec26-issue-1-0-considerations-for-establishing-the-date-of-examination-of-safety-valves-which-have-been-in-storage?format=html</guid>
           <description><![CDATA[]]></description>
           <author>Rachel.Culpan@safed.co.uk (Rachel Culpan)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Tue, 01 Oct 2024 16:58:13 +0100</pubDate>
       </item>
              <item>
           <title>PEDG03 - Iss 1.0 Aug 2024 A guide to information to be supplied to the PSSR competent person for drawing-up a written scheme of examination (EEMUA Publication 248)</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/134-pedg03-a-guide-to-information-to-be-supplied-to-the-pssr-competent-person-for-drawing-up-a-written-scheme-of-examination-eemua-publication-248?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/134-pedg03-a-guide-to-information-to-be-supplied-to-the-pssr-competent-person-for-drawing-up-a-written-scheme-of-examination-eemua-publication-248/file" length="676077" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/134-pedg03-a-guide-to-information-to-be-supplied-to-the-pssr-competent-person-for-drawing-up-a-written-scheme-of-examination-eemua-publication-248/file"
                fileSize="676077"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEDG03 - Iss 1.0 Aug 2024 A guide to information to be supplied to the PSSR competent person for drawing-up a written scheme of examination (EEMUA Publication 248)</media:title>
           <media:description type="html"><![CDATA[]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/134-pedg03-a-guide-to-information-to-be-supplied-to-the-pssr-competent-person-for-drawing-up-a-written-scheme-of-examination-eemua-publication-248/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/current-joint-guidance-by-safed-and-pecf/134-pedg03-a-guide-to-information-to-be-supplied-to-the-pssr-competent-person-for-drawing-up-a-written-scheme-of-examination-eemua-publication-248?format=html</guid>
           <description><![CDATA[]]></description>
           <author>Rachel.Culpan@safed.co.uk (Rachel Culpan)</author>
           <category>Current joint guidance by SAFed and PECF</category>
           <pubDate>Tue, 03 Sep 2024 09:06:19 +0100</pubDate>
       </item>
              <item>
           <title>PEC25 Issue 1.0 - Guidance Self-Contained Breathing Apparatus</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/131-pec25-issue-1-0-guidance-self-contained-breathing-apparatus?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/131-pec25-issue-1-0-guidance-self-contained-breathing-apparatus/file" length="461440" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/131-pec25-issue-1-0-guidance-self-contained-breathing-apparatus/file"
                fileSize="461440"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC25 Issue 1.0 - Guidance Self-Contained Breathing Apparatus</media:title>
           <media:description type="html"><![CDATA[]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/131-pec25-issue-1-0-guidance-self-contained-breathing-apparatus/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/131-pec25-issue-1-0-guidance-self-contained-breathing-apparatus?format=html</guid>
           <description><![CDATA[]]></description>
           <author>Rachel.Culpan@safed.co.uk (Rachel Culpan)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Tue, 07 May 2024 16:19:26 +0100</pubDate>
       </item>
              <item>
           <title>PEC20 - ISSUE 1.1 - Inspection of Wellman Robey Ygnette/Sygnette Boilers (2007 – 2016)</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/129-pec20-issue-1-1-inspection-of-wellman-robey-ygnette-sygnette-boilers-2007-2016?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/129-pec20-issue-1-1-inspection-of-wellman-robey-ygnette-sygnette-boilers-2007-2016/file" length="559001" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/129-pec20-issue-1-1-inspection-of-wellman-robey-ygnette-sygnette-boilers-2007-2016/file"
                fileSize="559001"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC20 - ISSUE 1.1 - Inspection of Wellman Robey Ygnette/Sygnette Boilers (2007 – 2016)</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/129-pec20-issue-1-1-inspection-of-wellman-robey-ygnette-sygnette-boilers-2007-2016/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/129-pec20-issue-1-1-inspection-of-wellman-robey-ygnette-sygnette-boilers-2007-2016?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>Rachel.Culpan@safed.co.uk (Rachel Culpan)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 15 Dec 2023 14:16:35 +0000</pubDate>
       </item>
              <item>
           <title>PEC22 - ISSUE 1.0 - Application of the Pressure System Safety Regulations in relation to Intermediate Bulk Containers (IBC)</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/128-pec22-iss1-0-application-of-the-pressure-system-safety-regulations-in-relation-to-intermediate-bulk-containers-ibc?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/128-pec22-iss1-0-application-of-the-pressure-system-safety-regulations-in-relation-to-intermediate-bulk-containers-ibc/file" length="635819" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/128-pec22-iss1-0-application-of-the-pressure-system-safety-regulations-in-relation-to-intermediate-bulk-containers-ibc/file"
                fileSize="635819"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC22 - ISSUE 1.0 - Application of the Pressure System Safety Regulations in relation to Intermediate Bulk Containers (IBC)</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/128-pec22-iss1-0-application-of-the-pressure-system-safety-regulations-in-relation-to-intermediate-bulk-containers-ibc/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/128-pec22-iss1-0-application-of-the-pressure-system-safety-regulations-in-relation-to-intermediate-bulk-containers-ibc?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>Rachel.Culpan@safed.co.uk (Rachel Culpan)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Tue, 26 Sep 2023 13:13:42 +0100</pubDate>
       </item>
              <item>
           <title>PEC24 - ISSUE 1.0 - Application of Pressure System Safety Regulations in relation to Heat Pumps</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/127-pec-24-issue-1-0-application-of-pressure-system-safety-regulations-in-relation-to-heat-pumps?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/127-pec-24-issue-1-0-application-of-pressure-system-safety-regulations-in-relation-to-heat-pumps/file" length="452237" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/127-pec-24-issue-1-0-application-of-pressure-system-safety-regulations-in-relation-to-heat-pumps/file"
                fileSize="452237"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC24 - ISSUE 1.0 - Application of Pressure System Safety Regulations in relation to Heat Pumps</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/127-pec-24-issue-1-0-application-of-pressure-system-safety-regulations-in-relation-to-heat-pumps/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/127-pec-24-issue-1-0-application-of-pressure-system-safety-regulations-in-relation-to-heat-pumps?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>Rachel.Culpan@safed.co.uk (Rachel Culpan)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Wed, 12 Apr 2023 12:31:05 +0100</pubDate>
       </item>
              <item>
           <title>A20039 SBG 2 Issue 3 Shell Boilers – Guidelines for the examination of longitudinal seams of shell boilers</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/122-a20039-sbg-2-version-3-07-2014?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/122-a20039-sbg-2-version-3-07-2014/file" length="575086" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/122-a20039-sbg-2-version-3-07-2014/file"
                fileSize="575086"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">A20039 SBG 2 Issue 3 Shell Boilers – Guidelines for the examination of longitudinal seams of shell boilers</media:title>
           <media:description type="html"><![CDATA[]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/122-a20039-sbg-2-version-3-07-2014/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/122-a20039-sbg-2-version-3-07-2014?format=html</guid>
           <description><![CDATA[]]></description>
           <author>Rachel.Culpan@safed.co.uk (Rachel Culpan)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 17 Mar 2023 17:49:58 +0000</pubDate>
       </item>
              <item>
           <title>PEC19 - ISSUE 2.0 - Inclusion of fire suppression systems in the WSE</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/118-pec-19-issue-02-13-04-2021-mh-jr-guidance-inclusion-of-fire-suppression-systems-in-the-wse?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/118-pec-19-issue-02-13-04-2021-mh-jr-guidance-inclusion-of-fire-suppression-systems-in-the-wse/file" length="432198" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/118-pec-19-issue-02-13-04-2021-mh-jr-guidance-inclusion-of-fire-suppression-systems-in-the-wse/file"
                fileSize="432198"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC19 - ISSUE 2.0 - Inclusion of fire suppression systems in the WSE</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/118-pec-19-issue-02-13-04-2021-mh-jr-guidance-inclusion-of-fire-suppression-systems-in-the-wse/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/118-pec-19-issue-02-13-04-2021-mh-jr-guidance-inclusion-of-fire-suppression-systems-in-the-wse?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:40 +0000</pubDate>
       </item>
              <item>
           <title>PEC17 - ISSUE 2.0 - Guidance for vessels with fusion welded cladding</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/117-pec-17-issue-02-01-06-2011-mh-jr-guidance-guidance-for-vessels-with-fusion-welded-cladding?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/117-pec-17-issue-02-01-06-2011-mh-jr-guidance-guidance-for-vessels-with-fusion-welded-cladding/file" length="530951" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/117-pec-17-issue-02-01-06-2011-mh-jr-guidance-guidance-for-vessels-with-fusion-welded-cladding/file"
                fileSize="530951"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC17 - ISSUE 2.0 - Guidance for vessels with fusion welded cladding</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/117-pec-17-issue-02-01-06-2011-mh-jr-guidance-guidance-for-vessels-with-fusion-welded-cladding/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/117-pec-17-issue-02-01-06-2011-mh-jr-guidance-guidance-for-vessels-with-fusion-welded-cladding?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:39 +0000</pubDate>
       </item>
              <item>
           <title>PEC16 - ISSUE 1.1 – Following report of an incident involving the failure of an autoclave door</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/116-pec-16-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-autoclave-door?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/116-pec-16-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-autoclave-door/file" length="490540" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/116-pec-16-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-autoclave-door/file"
                fileSize="490540"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC16 - ISSUE 1.1 – Following report of an incident involving the failure of an autoclave door</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/116-pec-16-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-autoclave-door/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/116-pec-16-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-autoclave-door?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:37 +0000</pubDate>
       </item>
              <item>
           <title>PEC15 - ISSUE 1.1 - Following report of an incident involving the failure of an air pressurised road tanker</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/115-pec-15-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-air-pressurised-road-tanker?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/115-pec-15-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-air-pressurised-road-tanker/file" length="466199" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/115-pec-15-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-air-pressurised-road-tanker/file"
                fileSize="466199"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC15 - ISSUE 1.1 - Following report of an incident involving the failure of an air pressurised road tanker</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/115-pec-15-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-air-pressurised-road-tanker/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/115-pec-15-issue-01-1-08-04-2021-mh-jr-guidance-following-report-of-an-incident-involving-the-failure-of-an-air-pressurised-road-tanker?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:36 +0000</pubDate>
       </item>
              <item>
           <title>PEC13 - ISSUE 8.0 – Safety Valve Examination – Setting and Sizing requirements</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/114-pec-13-issue-08-27-04-2021-mh-jr-guidance-safety-valve-examination-setting-and-sizing-requirements?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/114-pec-13-issue-08-27-04-2021-mh-jr-guidance-safety-valve-examination-setting-and-sizing-requirements/file" length="881886" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/114-pec-13-issue-08-27-04-2021-mh-jr-guidance-safety-valve-examination-setting-and-sizing-requirements/file"
                fileSize="881886"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC13 - ISSUE 8.0 – Safety Valve Examination – Setting and Sizing requirements</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/114-pec-13-issue-08-27-04-2021-mh-jr-guidance-safety-valve-examination-setting-and-sizing-requirements/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/114-pec-13-issue-08-27-04-2021-mh-jr-guidance-safety-valve-examination-setting-and-sizing-requirements?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:35 +0000</pubDate>
       </item>
              <item>
           <title>PEC12 - ISSUE 3.0 - Completing in service examination (working/supplementary) on shell type boilers with multiple fuels</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/113-pec-12-issue-02-27-04-2021-mh-jr-guidance-completing-in-service-examination-working-supplementary-on-shell-type-boilers-with-multiple-fuels?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/113-pec-12-issue-02-27-04-2021-mh-jr-guidance-completing-in-service-examination-working-supplementary-on-shell-type-boilers-with-multiple-fuels/file" length="436020" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/113-pec-12-issue-02-27-04-2021-mh-jr-guidance-completing-in-service-examination-working-supplementary-on-shell-type-boilers-with-multiple-fuels/file"
                fileSize="436020"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC12 - ISSUE 3.0 - Completing in service examination (working/supplementary) on shell type boilers with multiple fuels</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/113-pec-12-issue-02-27-04-2021-mh-jr-guidance-completing-in-service-examination-working-supplementary-on-shell-type-boilers-with-multiple-fuels/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/113-pec-12-issue-02-27-04-2021-mh-jr-guidance-completing-in-service-examination-working-supplementary-on-shell-type-boilers-with-multiple-fuels?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:33 +0000</pubDate>
       </item>
              <item>
           <title>PEC10 - ISSUE 1.1 – For underground / buried pipework</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/112-pec-10-issue-01-1-08-04-21-mh-jr-guidance-for-underground-buried-pipework?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/112-pec-10-issue-01-1-08-04-21-mh-jr-guidance-for-underground-buried-pipework/file" length="426027" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/112-pec-10-issue-01-1-08-04-21-mh-jr-guidance-for-underground-buried-pipework/file"
                fileSize="426027"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC10 - ISSUE 1.1 – For underground / buried pipework</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/112-pec-10-issue-01-1-08-04-21-mh-jr-guidance-for-underground-buried-pipework/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/112-pec-10-issue-01-1-08-04-21-mh-jr-guidance-for-underground-buried-pipework?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:32 +0000</pubDate>
       </item>
              <item>
           <title>PEC09 - ISSUE 3.2 - Guidance – For the competent Person when assessing overpressure protection</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/111-pec-09-issue-03-2-20-04-2021-mh-jr-guidance-for-the-competent-person-when-assessing-overpressure-protection?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/111-pec-09-issue-03-2-20-04-2021-mh-jr-guidance-for-the-competent-person-when-assessing-overpressure-protection/file" length="1344657" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/111-pec-09-issue-03-2-20-04-2021-mh-jr-guidance-for-the-competent-person-when-assessing-overpressure-protection/file"
                fileSize="1344657"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC09 - ISSUE 3.2 - Guidance – For the competent Person when assessing overpressure protection</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/111-pec-09-issue-03-2-20-04-2021-mh-jr-guidance-for-the-competent-person-when-assessing-overpressure-protection/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/111-pec-09-issue-03-2-20-04-2021-mh-jr-guidance-for-the-competent-person-when-assessing-overpressure-protection?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:31 +0000</pubDate>
       </item>
              <item>
           <title>PEC08 - ISSUE 1.1 - Guidance PSG 04. Guidelines for the Production of Written Schemes of Examination and the Examination of Pressure Vessels Incorporating Openings to Facilitate Ready Internal Access</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/110-pec-08-issue-01-1-08-04-2021-mh-jr-guidance-psg-04-guidelines-for-the-production-of-written-schemes-of-examination-and-the-examination-of-pressure-vessels-incorporating-openings-to-facilitate-ready-internal-access?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/110-pec-08-issue-01-1-08-04-2021-mh-jr-guidance-psg-04-guidelines-for-the-production-of-written-schemes-of-examination-and-the-examination-of-pressure-vessels-incorporating-openings-to-facilitate-ready-internal-access/file" length="749591" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/110-pec-08-issue-01-1-08-04-2021-mh-jr-guidance-psg-04-guidelines-for-the-production-of-written-schemes-of-examination-and-the-examination-of-pressure-vessels-incorporating-openings-to-facilitate-ready-internal-access/file"
                fileSize="749591"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC08 - ISSUE 1.1 - Guidance PSG 04. Guidelines for the Production of Written Schemes of Examination and the Examination of Pressure Vessels Incorporating Openings to Facilitate Ready Internal Access</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/110-pec-08-issue-01-1-08-04-2021-mh-jr-guidance-psg-04-guidelines-for-the-production-of-written-schemes-of-examination-and-the-examination-of-pressure-vessels-incorporating-openings-to-facilitate-ready-internal-access/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/110-pec-08-issue-01-1-08-04-2021-mh-jr-guidance-psg-04-guidelines-for-the-production-of-written-schemes-of-examination-and-the-examination-of-pressure-vessels-incorporating-openings-to-facilitate-ready-internal-access?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:29 +0000</pubDate>
       </item>
              <item>
           <title>PEC04 - ISSUE 5.0 - Guidance – PESR 2016 and PSSR 2000 – Frequently asked questions and answers</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/109-pec-04-issue-05-08-12-2016-mh-jr-guidance-pesr-2016-and-pssr-2000-frequently-asked-questions-and-answers?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/109-pec-04-issue-05-08-12-2016-mh-jr-guidance-pesr-2016-and-pssr-2000-frequently-asked-questions-and-answers/file" length="580617" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/109-pec-04-issue-05-08-12-2016-mh-jr-guidance-pesr-2016-and-pssr-2000-frequently-asked-questions-and-answers/file"
                fileSize="580617"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC04 - ISSUE 5.0 - Guidance – PESR 2016 and PSSR 2000 – Frequently asked questions and answers</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/109-pec-04-issue-05-08-12-2016-mh-jr-guidance-pesr-2016-and-pssr-2000-frequently-asked-questions-and-answers/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/109-pec-04-issue-05-08-12-2016-mh-jr-guidance-pesr-2016-and-pssr-2000-frequently-asked-questions-and-answers?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:28 +0000</pubDate>
       </item>
              <item>
           <title>PEC02 ISSUE 2.1 - Guidance – Size of access openings in boilers and pressure vessels</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/108-pec-02-issue-02-1-27-04-2021-mh-jr-guidance-size-of-access-openings-in-boilers-and-pressure-vessels?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/108-pec-02-issue-02-1-27-04-2021-mh-jr-guidance-size-of-access-openings-in-boilers-and-pressure-vessels/file" length="485812" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/108-pec-02-issue-02-1-27-04-2021-mh-jr-guidance-size-of-access-openings-in-boilers-and-pressure-vessels/file"
                fileSize="485812"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PEC02 ISSUE 2.1 - Guidance – Size of access openings in boilers and pressure vessels</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/108-pec-02-issue-02-1-27-04-2021-mh-jr-guidance-size-of-access-openings-in-boilers-and-pressure-vessels/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/in-service-inspection-procedures-for-download-or-to-receive-a-printed-version-contact-safed/108-pec-02-issue-02-1-27-04-2021-mh-jr-guidance-size-of-access-openings-in-boilers-and-pressure-vessels?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>In-service inspection procedures for download or to receive a printed version contact SAFed</category>
           <pubDate>Fri, 16 Dec 2022 15:23:27 +0000</pubDate>
       </item>
              <item>
           <title>PSG16 ISSUE 4.1 - Acceptance of equipment, establishment of safe operating limits and fitness for service</title>
           <link>https://www.safed.co.uk/publications-home/tc-1/current-guidelines-for-download/35-psg16-guidelines-acceptance-of-equipment-establishment-of-safe-operating-limits-and-fitness-for-service?format=html</link>
           <enclosure url="https://www.safed.co.uk/publications-home/tc-1/current-guidelines-for-download/35-psg16-guidelines-acceptance-of-equipment-establishment-of-safe-operating-limits-and-fitness-for-service/file" length="959428" type="application/pdf" />
           <media:content
                url="https://www.safed.co.uk/publications-home/tc-1/current-guidelines-for-download/35-psg16-guidelines-acceptance-of-equipment-establishment-of-safe-operating-limits-and-fitness-for-service/file"
                fileSize="959428"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">PSG16 ISSUE 4.1 - Acceptance of equipment, establishment of safe operating limits and fitness for service</media:title>
           <media:description type="html"><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></media:description>
                      <media:thumbnail url="https://www.safed.co.uk/publications-home/tc-1/current-guidelines-for-download/35-psg16-guidelines-acceptance-of-equipment-establishment-of-safe-operating-limits-and-fitness-for-service/file" />
                      <guid isPermaLink="true">https://www.safed.co.uk/publications-home/tc-1/current-guidelines-for-download/35-psg16-guidelines-acceptance-of-equipment-establishment-of-safe-operating-limits-and-fitness-for-service?format=html</guid>
           <description><![CDATA[<p> </p>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>
<div style="position: absolute; top: 0px; left: 0px; margin: 0px; padding: 0px; width: 0px; height: 0px;"> </div>]]></description>
           <author>chris@lightbulbwebdesign.co.uk (Super User)</author>
           <category>Current Guidelines for download</category>
           <pubDate>Tue, 05 Apr 2022 11:40:08 +0100</pubDate>
       </item>
          </channel>
</rss>